Default QALT test planning

I am having difficulties to understand how to conclude information of following test planning results,
-
- confidence level
- bounds ratio

My test planning is relating to case where two temperature stress levels are used and unfortunately I have only 12 samples available for test. Some engineering jugdement was utilized to estimate Weibull parameters and based on the test plan results I am worried about quite big variance at B10 to be demonstrated. However confidence level seems to be resonable 73% when bounds ratio is 3. Should I worry about potentially too small sample size or just push Go button?
Reply With Quote
  #2  
Old November 12th, 2009, 05:51 PM
Pantelis Pantelis is offline
Super Moderator
 
Join Date: Jan 1992
Location: USA
Posts: 355
Default Re: QALT test planning

If your CB's are reasonable as you say I would push GO...
__________________
Pantelis Vassilou
Reply With Quote
  #3  
Old November 13th, 2009, 12:30 AM
JON_BK JON_BK is offline
Junior Member
 
Join Date: Sep 2009
Posts: 6
Default Re: QALT test planning

Thank you for support. However I am still challenged by the design team having a lot of Six Sigma knowlegde to explain and justify test starting as test time and costs are big compared to project resources.
Luckily some usage rate acceleration can be applied and there is also potential to apply degradation analysis to make testing faster. These are the actual results of test plan, time scale is in days. All support how to explain in plain English this to design team (why we should not worry about Standard Deviation of Tp 951 days before and during testing) highly appriaciated.

2 Level Statistically Optimum Plan

Use Level Unreliability Criterion0,1 (B10)

Distribution Weibull Beta 4

Stress Count 1

Test Duration 1095

Allocated Units 12

Stress 1

Stress Relation Arrhenius

Use Stress 345
Highest Stress 365

Probabilities of Failure
P(Test Duration, Use Stress) 0,011
P(Test Duration, Highest Stress) 0,9

Results
Stress Level Portion Units Units on Test Probability of Failure
Low Stress Level 355 0,775 9 0,1667
High Stress Level 365 0,225 3 0,9

Tp (Time at Unreliability) 1924
Standard Deviation of Tp 951

Last edited by JON_BK; November 13th, 2009 at 12:43 AM. Reason: Text added and modified
Reply With Quote
  #4  
Old November 16th, 2009, 09:33 AM
Harry Harry is offline
ReliaSoft Support
 
Join Date: Dec 2005
Location: Henan, Xi'an, Wuhan, Singapore, Tucson
Posts: 113
Default Re: QALT test planning

The ALT Test plan tool in ALTA 7 provides the analytical solutions. Maybe it is not easy to imagine and explain the effect of the “Bound Ratio”, for example, how wide the confidence bound is when Bound Ratio = 3. In ALTA 7, there is another tool “SimMuatic” can be used to visually display the bounds. SimuMatic provides simulation results which should be very close to the analytical solution. For detail, please see:

http://reliability-discussion.com/showthread.php?t=2519
http://www.reliasoft.com/newsletter/v8i1/plans.htm

By playing with SimuMatic, you can show the 6-sigma guys that the relation between Confidence Level and Bound Ratio. In the examples shipped with ALTA 7, there is an example (Test Plan Using Simulation (SimuMatic).ralp) shows how to use SimuMatic to design a test plan. You can plot the one-sided confidence bounds in SimuMatic.

The expected variance of the Tp (BX life) is dramatically affected by the assumed beta value. If you increase beta, it will decrease. 6-sigma theory is based on the normal distribution assumption. This is not the case in life data analysis. One common practice in life data analysis is to use the logarithm transform of the life and assume the transformed value is normally distributed. In fact, this theory is used in the test plan to calculate the bound and bound ratio. For your case:

Tp = 1924; Std (Tp) = 951; Var(Tp) = 951^2 = 904401;
ln(Tp) = 7.56; Var(ln(Tp)) is calcualted by: Var(ln(Tp)) = 1/(Tp^2)*Var(Tp) = 0.244; Std(ln(Tp)) = 0.49.

So at the logarithm scale, the standard deviation is not too bad. The two-sided bounds at 73% confidence level is calculated:
Upper: ln(Tp)+1.103*std(ln(Tp)) = 7.56 + 1.103*0.49 = 8.10047;
Lower: ln(Tp)-1.103*std(ln(Tp)) = 7.56 – 1.103*0.49 = 7.0195;
1.103 is the (1-(1-0.73)/2) normal percentile.

Transform them back to the linear scale, the upper bound is exp(8.10047) = 3296 and the lower bound is 1118. The bound ratio is 3296/1118 = 2.95. The little difference between this result and the result in the software is caused by the precision.
__________________
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 05:39 AM.


Powered by vBulletin
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
Copyright ©1992-2005 ReliaSoft Corporation, All Rights Reserved