![]() |
|
#1
|
|||
|
|||
|
BlockSim doesn't seem to offer confidence limits results, but the Diagram function in Weibull, similar functionality to Blocksim does. Can you explain why this is?
Thanks |
|
#2
|
|||
|
|||
|
Hi Robbie,
In BlockSim, parameters are specified for each block. There is not any uncertainty associated with these parameters. In general, actual data is required to obtain confidence bounds. In Weibull++, the blocks in the diagram are linked to actual data sets within the project. Therefore, confidence bounds can be calculated since data is given. I hope this helps.
__________________
David |
|
#3
|
|||
|
|||
|
There is previous post on the subject:
http://www.reliasoftforums.com/showthread.php?t=396 |
![]() |
| Thread Tools | |
| Display Modes | |
|
|