Abhay
April 27th, 2007, 03:08 AM
Hi All,
I m a new member to this forum. I had the following query.
In DRT (Weibull), there is required time we need to input along with Rel and CL to get the test time or sample size.
Does this required time means, mission time or total time the product is going to witness in its specified life?
Say the mission time of one operation using the product is 1 hour and total operation use throughout its life is 5000 hrs. what we have to feed in required time in DRT?
Thanks in Advance
I m a new member to this forum. I had the following query.
In DRT (Weibull), there is required time we need to input along with Rel and CL to get the test time or sample size.
Does this required time means, mission time or total time the product is going to witness in its specified life?
Say the mission time of one operation using the product is 1 hour and total operation use throughout its life is 5000 hrs. what we have to feed in required time in DRT?
Thanks in Advance