lowens
August 25th, 2006, 06:21 AM
Hello,
Can anyone help me with the following:
1. Mean Time under "Block->Inspections". Can someone please clarify the meaning of this. Is this the mean time between inspections, or the mean time for an inspection? E.g. for a specific component in my RBD I envisage 4 inspections per year - how should I enter this if mean time is in hours.
2. Also, I'd to export my RBD diagram into a Word document but would like to tidy up the format first. Is there any way I can move / drag the block connection lines?
Thanks
Can anyone help me with the following:
1. Mean Time under "Block->Inspections". Can someone please clarify the meaning of this. Is this the mean time between inspections, or the mean time for an inspection? E.g. for a specific component in my RBD I envisage 4 inspections per year - how should I enter this if mean time is in hours.
2. Also, I'd to export my RBD diagram into a Word document but would like to tidy up the format first. Is there any way I can move / drag the block connection lines?
Thanks