Robbie
August 18th, 2009, 06:26 AM
If I have a maximum mission time (say I need an equipment to run for 100 hours), i.e. machine operation will always be stopped at around 100 hours, but can have multiple failure during this operating period, how would I model this in Weibull - I've input the data, but get probabilites of failures for times in excess of 100 + hours which is not possible in the scenario I'm modelling. Can we stipulate the maximum mission/operation time at all?