We have two pumps in parallel configuration, (duty and standby). Generally, how would got about determining the best policy for this, i.e.
does one let the duty pump run to fail, or does one introduce load sharing, i..e allow the standby pump to run, for example 20% of the shift, then move back to the original pump;
The main worry is, the probability of failure on demand......
does one let the duty pump run to fail, or does one introduce load sharing, i..e allow the standby pump to run, for example 20% of the shift, then move back to the original pump;
The main worry is, the probability of failure on demand......