red_moon
January 9th, 2008, 02:25 AM
[隱藏]
mean time between unscheduled removals, MTBUR
eq1)
MTBUR = (FHxnxN)/NR
FH = Flight hour per aircraft
n = Number of aircraft
N = Quantity of Units removed from aircraft
NR = Number of removals of item
2 units are installed in the aircraft
if one unit is inoperative, only one would be replaced
if both are inoperative, replace both at the same time
20 aircrafts
operate 10 hrs/day
20 items were replaced but 8 of them were replaced at the same time
how should i do it?
as i saw there is the other equation for MTBUR
Number of flight hours x units installed per aircraft
Number of unscheduled removals during that period
= MTBUR
i tried to use both but ans are not the same.......
the 2nd equation is easier for calculation but i was told to use the 1st one
please give me some advice for it...
thanks for ur reply
mean time between unscheduled removals, MTBUR
eq1)
MTBUR = (FHxnxN)/NR
FH = Flight hour per aircraft
n = Number of aircraft
N = Quantity of Units removed from aircraft
NR = Number of removals of item
2 units are installed in the aircraft
if one unit is inoperative, only one would be replaced
if both are inoperative, replace both at the same time
20 aircrafts
operate 10 hrs/day
20 items were replaced but 8 of them were replaced at the same time
how should i do it?
as i saw there is the other equation for MTBUR
Number of flight hours x units installed per aircraft
Number of unscheduled removals during that period
= MTBUR
i tried to use both but ans are not the same.......
the 2nd equation is easier for calculation but i was told to use the 1st one
please give me some advice for it...
thanks for ur reply