View Full Version : Modeling alternative maintenance concepts in Blocksim


Trinkle
September 8th, 2004, 09:49 AM
I need some help setting up alternative maintenance concepts. In Blocksim I have a simple system of two components in series. Each has the same failure distribution (from Weibull++: Lognormal(6.88,1.46)).

Scenario 1: I have set up the maintenance corrective action for each component to be replaced on failure. No preventative or inspection actions. I ran the analysis and simulation, obtaining reasonable reliability measures for this simple system.

Scenario 2: How do I set up the maintenance of the components so that when either component fails the other component is also replaced?

adam
September 9th, 2004, 12:29 PM
You can set this up in the PM policy. In reality you are performing a PM on the non-failed component when the other fails. Under the PM Policy window, you can check the option "Upon Maintenance of another Group Item." Make sure that the Item Group # is the same for both blocks. Please call our technical support at 520-886-0366 if you have any trouble finding these options.